Review · olpd-review
OLPD Report Review
Methodology and consistency review of your PD survey report — never a condition call.
Reviews an online partial discharge survey report for methodology completeness, internal consistency, and whether its conclusions are supported by the data it presents. Does not assess equipment condition, assign severity, estimate remaining life, or recommend maintenance or outage action — this reviews the report, not the equipment.
What this product is for
An online partial discharge survey arrives as a report with a colour on it, and the colour drives a six-figure decision about whether to take a substation out of service. Almost nobody who receives one is in a position to audit how it was reached — which sensors, coupled where, in what units, against what noise floor, compared to which baseline, with what left untested. This product reviews the report rather than the equipment. Fifty checks across method, units, noise discrimination, coverage, test conditions, trending, presentation, and PRPD pattern reasoning, asking one question throughout: are the conclusions this report draws supported by the data this report presents? It renders no opinion on your switchgear. It is prevented in code from assigning severity, estimating remaining life, or recommending an outage.
What the 50-point checklist covers
50 discrete checks across 10 areas. Applies to: Online partial discharge survey reports for MV switchgear, cable, transformers, motors, generators, and busway.
- Measurement method and instrumentation
- Units and calibration basis
- Noise discrimination
- Asset coverage
- Test conditions
- Trending and comparison
- Data presentation
- Standing interrogation set
- PRPD pattern analysis
- PD type statements
Grounded in an owner-authored review checklist. Every finding includes its source page and, where a code citation applies, the section it is based on — never from memory.
What this explicitly does not do
- Assessing the condition of any equipment
- Assigning severity or criticality
- Estimating time to failure or remaining life
- Recommending or discouraging maintenance or outage action
- Ingesting raw instrument data files
- Generating PRPD or trend plots from customer data
These are structural limits on the product, not a description of effort. Absence of a finding is never evidence of compliance.
A finding in this product's format
PD type asserted without the pattern evidence that would support it
The report characterises activity at this asset as a specific discharge type but presents no phase-resolved pattern, no pulse polarity or phase-relationship discussion, and no stated basis for the classification. The classification may well be correct; as presented it cannot be checked by a reader, and it is the classification that drives the recommended action. Request the underlying pattern data from the survey provider.
Illustrative and redacted. Not real customer data. See full sample reports →
Turnaround
- Automated release: Typically 1 business day.
- Expert-reviewed: Typically 3 business days.
What you'll upload
- OLPD survey report (PDF) (required)
Upload the survey report, not raw instrument files. This review evaluates how the survey was performed and whether its conclusions are supported by the data shown. It does not assess equipment condition.
- Single-line diagram (PDF) (required)
Used to check sensor coverage against the actual system.
- Prior OLPD reports for the same assets (optional PDF) (optional)
Enables the trending checks, which are the highest-value findings this engine produces.
If this document needs more than a preliminary screening, the same firm offers a stamped engineering review by a licensed P.E.(opens in a new tab, external site) directly. That work is engaged separately from this Service — buying a review here does not create that engagement.
OLPD Report Review — common questions
- Does this tell me whether my equipment has a problem?
- No — and that boundary is enforced, not merely stated. Assessing equipment condition, assigning severity, estimating remaining life, and recommending or discouraging maintenance or outage action are all out of scope, and post-generation validation rejects any finding whose language asserts equipment health or recommends an action. This reviews the report, not the equipment.
- Why would I pay to review a report I already paid for?
- Because the survey provider and the report author are usually the same party, and the report is the basis for what you do next. An independent read of the methodology tells you whether the conclusion is supported, what was not tested, and which questions to put back to the provider before you act on it.
- Do I need to send raw instrument data?
- No — and it would not be read. Ingesting raw instrument files and generating PRPD or trend plots from your data are both out of scope. Submit the survey report as issued to you; that is the document under review.
- What does the expert lane add?
- The expert lane is read personally by Jay R. Prigmore II, Ph.D., P.E. — a Ph.D. electrical power engineer with 400+ forensic investigations of electrical equipment failures behind him. Every finding is approved, edited, or removed by him before release. This product presents the expert lane first at checkout because the reasoning in a PD report is exactly the kind of thing worth a person reading.
- Which assets does it cover?
- Survey reports for MV switchgear, cable, transformers, motors, generators, and busway. Pricing is by asset count, published, and locked before upload.